3. Set the four spacers [A] at the four corners (in the indents provided).
4. Place the projector unit [B] on the table by aligning the holes in the
projector base plate with the positioning pins [C]. Then secure the
projector unit with four M4 x 12 screws.
NOTE: When securing the screw [D], insert the spring washer [E]
between the screw and the projector unit. This spring washer
grounds the projector unit frame.
[B]
[D]
[E]
[C]
[A]
[A]
Installation
Procedure
FILM PROJECTOR UNIT (A718) INSTALLATION
SM 3-55 A166/A187/A189
Comments to this Manuals