36. Remove the cleaning blade release wedge [A] of the transfer belt unit
while pushing up the pressure release lever [B].
37. Remove the transfer belt retainer [C] from the transfer belt stay [D].
NOTE: Keep the cleaning blade release wedge and the transfer belt
retainer (along with the retainer’s securing screw) after installing
the machine. These parts will be re-used if the machine is moved
to another location in the future.
38. Move the belt tension release lever [E] counter clockwise to the upper
position [F] (1 screw).
NOTE: Failure to do this may damage the transfer belt in step 39.
39. Remove the belt transfer corona unit [G] (1 snap ring).
40. Move the belt tension release lever [E] back to the lower position [H] (1
screw).
41. Remove the paper transfer corona unit [I], (1screw).
42. Remove the transfer belt stay [J] (3 screws, 4 connectors [K], [L], [M], [N]
and 1 wire clamp).
[B]
[A]
[C]
[D]
[E]
[H]
[F]
[G]
[I]
[J]
[K]
[L]
[M]
[N]
Installation
Procedure
COPIER INSTALLATION
SM 3-21 A166/A187/A189
Comments to this Manuals